              What are the precautions for spraying ECTFE on lithium battery equipment

              Source:www.tiantiancps.com      Release date: 2025年02月05日
              Information summary:When spraying ECTFE (ethylene trifluorochloroethylene copolymer) on lithium battery equipment, there are many key points to pay attention to, including surface treatment, spraying environment, material selection, etc. The following is a specific introduction: 1. Surface treatment Cleaning: The surface of the parts to be sprayed on lithium battery equipment must be cleaned to remove impuriti
                   When spraying ECTFE (ethylene trifluorochloroethylene copolymer) on lithium battery equipment, there are many key points to pay attention to, including surface treatment, spraying environment, material selection, etc. The following is a specific introduction:
              1. Surface treatment
                   Cleaning: The surface of the parts to be sprayed on lithium battery equipment must be cleaned to remove impurities such as oil stains, dust, rust, and release agents. Solvent cleaning, sandblasting, and other methods can be used. If there is oil stains on the surface, it will cause a decrease in the adhesion of the ECTFE coating and result in peeling.
                   Coarsening: To enhance coating adhesion, it is usually necessary to roughen the surface, such as sandblasting or chemical corrosion. The degree of roughening should be moderate, as excessive roughening can result in uneven surface roughness, affecting the appearance and performance of the coating; The effect of improving adhesion through detailed rules is not significant.
              2. Spray environment
                  Temperature: The spraying environment temperature should be controlled between 15 ℃ and 35 ℃. If the temperature is too low, the leveling of ECTFE coating will be poor, resulting in defects such as orange peel and sagging; If the temperature is too high and the coating dries too quickly, it may cause the spray gun to clog and increase the internal stress of the coating, making it easy to crack.
                  Humidity: The environmental humidity should be maintained between 40% and 70%. Excessive humidity can lead to the formation of a water film on the surface of the coating, resulting in blistering, whitening, and reduced adhesion; Low humidity can generate static electricity, causing uneven dispersion of coating particles during the spraying process.
                  Ventilation: The spraying area should have a good ventilation system to timely discharge volatile solvents and exhaust gases, which can reduce the concentration of flammable gases and prevent safety accidents such as explosions; On the other hand, it can timely release the volatile gases during the drying process of the coating, avoiding affecting the quality of the coating.
              3. Material selection
                   ECTFE coating: The appropriate model of ECTFE coating should be selected based on the usage environment and performance requirements of lithium battery equipment. For components that come into contact with electrolytes, coatings with good resistance to electrolyte corrosion should be selected; For areas with high wear resistance requirements, ECTFE coatings containing wear-resistant fillers should be selected.
                   Diluent: Use the diluent that matches the ECTFE coating and dilute it strictly according to the specified ratio. Excessive use of diluent can reduce the solid content of the coating, affecting the thickness and performance of the coating; Insufficient dosage, high viscosity of coating, difficulty in spraying, affecting atomization effect.
              4. Spraying operation
                   Spray gun debugging: Before spraying, it is necessary to carefully debug the spray gun, including adjusting parameters such as pressure, flow rate, and nozzle diameter. Excessive pressure can cause excessive atomization of the coating, resulting in thinning and unevenness of the coating; Insufficient pressure can lead to poor atomization of the coating, resulting in accumulation and sagging.
                   Spray thickness: The principle of multiple thin coatings should be followed, and the thickness of each spray should be controlled within an appropriate range. Generally, the dry film thickness is around 50-100 microns per coat. If the coating is sprayed too thick at once, bubbles and pinholes are easily generated inside the coating, and the drying and curing time is long, which can lead to problems such as cracking and peeling.
                   Spray distance and angle: The distance between the spray gun and the surface of the object to be coated is generally maintained at 150-300 millimeters, and the spray angle is around 90 degrees. Being too close can lead to paint accumulation; Distance too far, paint scattering, low utilization rate, and poor coating uniformity.
              5. Curing treatment
                   Temperature control: After spraying the ECTFE coating, it needs to undergo curing treatment. The curing temperature is usually between 230 ℃ -280 ℃, and the specific temperature is determined according to the coating formula and equipment requirements. The curing temperature is too low, the coating cannot fully crosslink and cure, and the performance does not meet the requirements; Excessive temperature can cause coating aging and discoloration, affecting its service life.
                   Curing time: The curing time is generally 1-3 hours, and the specific time depends on factors such as coating thickness, curing temperature, and equipment heating efficiency. The curing time is too short, and the coating curing is incomplete; Excessive time not only increases production costs, but may also have adverse effects on coating performance.
              6. Quality inspection
                  Appearance inspection: After the coating is cured, the first step is to conduct an appearance inspection to observe whether the coating surface is flat, smooth, and whether there are defects such as bubbles, pinholes, sagging, orange peel, etc. If any appearance defects are found, the cause should be analyzed in a timely manner and corresponding measures should be taken for repair.
                  Performance testing: Testing the performance of coatings, such as adhesion, hardness, corrosion resistance, etc. Adhesion can be tested using the grid method, hardness can be measured using a hardness tester, and corrosion resistance can be tested through salt spray tests. Coatings that fail performance testing need to be re sprayed or remedial measures taken.
              主站蜘蛛池模板: 天天躁日日躁狠狠躁一级毛片 | 久久免费看视频| 国产美女一级视频| 大陆少妇xxxx做受| 性宝福精品导航| 欧美又粗又大又硬又长又爽视频| 欧美亚洲校园第一页| 日韩精品第一页| 欧美日韩国产va另类| 波少野结衣色在线| 波多野结衣久久高清免费| 翘臀少妇被扒开屁股日出水爆乳 | 国产成人av一区二区三区在线观看 | 男女一边摸一边爽爽视频| 精品国产乱码一区二区三区| 香蕉国产人午夜视频在线| 老子影院午夜伦不卡不四虎卡| 特一级黄色毛片| 日韩中文字幕a| 天堂网www资源在线| 国产欧美精品一区二区三区| 国产成人免费网站在线观看| 四虎永久网址影院| 亚洲综合激情视频| 久久婷婷人人澡人人爽人人爱| 亚洲av成人片在线观看| 两腿之间的私密图片| 182tv午夜精品视频在线播放| 英语老师解开裙子坐我腿中间| 深夜福利视频网站| 日韩欧美亚洲精品| 女教师巨大乳孔中文字幕| 国产精品美女自在线观看免费| 131美女爽爽爽爱做视频| 2020求一个网站男人都懂| 色妞www精品视频一级下载| 渣男渣女抹胸渣男渣女在一起| 日韩视频在线一区| 在线|一区二区三区| 啦啦啦手机在线中文观看| 亚洲人成未满十八禁网站|